Since August 2025 a law on legalising unauthorised buildings records a transfer ban for buildings without a permit. What to check in the cadastre, which permits matter, why a pending application is not legalisation, and how to protect the deposit.
In brief
Montenegro has a real backlog of buildings that were put up without full permitting, especially on the coast. Since August 2025 this is no longer only a legal-risk topic for the buyer: a law on the legalisation of unauthorised buildings records a ban on transfer for buildings without a permit, and notaries have been cautious about transactions where the annotation appears. Before you pay a deposit, check what is registered, what is permitted, and whether the building has actually been legalised. This is general information, not legal advice: a local lawyer should check the specific property.
What "illegal" usually means
As in other markets, three situations are often mixed together (the general guide to illegal construction and missing permits separates them).
- A building without a construction permit, or beyond it: an extra floor, a larger footprint, a closed terrace.
- A building that is lawful but has no use permit, so it is not formally complete.
- Unlicensed use, for example letting without the required registration (see Montenegro short-term rental rules).
The Montenegrin twist is registration. A building can be missing from the cadastre altogether, or the plot can be registered as land while the building on it is not. That is a different problem from a building that is registered but lacks permits, and the legalisation law deals with it first.
The 2025 legalisation law, in plain terms
- The law on the legalisation of unauthorised buildings was adopted in July 2025. Sources give different entry-into-force dates in August 2025, so treat it as in force since August 2025.
- For buildings without a permit the registry records a ban on transfer and on business use. One law-firm commentary reads the transfer ban as covering buildings built before the law as well, and says the Notary Chamber flagged ambiguities in that provision.
- Owners must start cadastral registration of their building by a deadline. The government says buildings that are not visible on July 2025 aerial or satellite images cannot be registered under the law.
- The deadline has been moved. A six-month extension in February 2026 is reported, and one August 2026 news report says Parliament extended it to August 2027. We could not confirm this against the Official Gazette, and the government's January 2026 amendments may or may not have been adopted in that form. Ask your lawyer for the current date and the current text.
- Reported uptake is low: about 62,500 applications and about 6% of them reviewed at December 2025, according to an agency blog. Treat that as a reported figure, but it means a legalisation that is only pending can take a long time.
The permit regime itself comes from the construction law of 2017, and we could not confirm which later amendments apply. The press describes the policy as zero tolerance for new unauthorised construction.
Documents to ask for, and what each proves
- A cadastre extract (list nepokretnosti): owner, parcel, building entry, area, use, mortgages and any transfer-restriction annotation. Get it from the cadastre yourself, as our Montenegro resale checklist advises, and repeat it close to closing. Compare what is registered with what you see: floors, area, number of units.
- The construction permit (građevinska dozvola) and the approved design: what was allowed to be built.
- The use permit (upotrebna dozvola): the building was inspected after completion and may be used. A building with a construction permit but no use permit is not in the same position as one with neither, but it is still not finished on paper.
- The legalisation decision and the cadastre entry that follows it, if the building was legalised.
- The seller's title, how it was acquired, any co-owners, and the land category (see the resale checklist for the limits on foreign ownership of agricultural and forest land).
Pending is not legalised
A building whose owner has applied for legalisation, but which has no decision and no cadastre entry, is not legalised. Commentary says the restriction can still be recorded in that state, and that notaries have often been cautious or have refused to proceed where the annotation appears. Do not accept "the application has been filed" as the same thing as "it is legalised". Ask for the decision and for a fresh extract that shows no restriction.
Coast, plots and state land
The coast around Budva, Bar and Kotor is where informal building is most often discussed, and our resale checklist says the coast has a real backlog of construction that predates full permitting. Beyond the building itself, ask your lawyer to check whether the plot or part of it is state land or lies in a coastal or maritime zone. We could not find the rules, so we do not describe them: this is a question to put to a local lawyer, not an answer.
What legalised means for resale and mortgage
- Resale: once a building is legalised the restriction should be gone from the cadastre, and the next buyer's notary will look for exactly that. Without it the sale cannot move forward.
- Mortgage: lenders generally ask for proof of the legal status of what they lend against. We could not confirm what Montenegrin banks require, so ask the bank before you rely on a loan; see mortgages for foreigners in Montenegro.
- Letting: the same record reportedly restricts business use. If you plan to let the property, ask your lawyer what this means for you.
- Price: a building that is not legalised should be priced as a legal problem, not as a normal flat with a small paperwork gap.
Consequences if something is wrong
- You may be unable to transfer or sell the property until it is legalised, and the cost and time of legalisation are yours as the new owner.
- Enforcement against unauthorised construction exists, and the press describes the new approach as strict. We did not find fines or procedures and do not state any.
- The restriction travels with the building: you inherit what the seller had.
How to check in practice
- Ask the seller in writing for the documents above before you pay a deposit.
- Pull the cadastre extract yourself and compare it with the property, with an independent architect or engineer if the building looks extended or converted.
- Have your own lawyer, not the agent's or the developer's, check the permits, the legalisation status and the annotations. See why a lawyer recommended by the agent or developer is a conflict of interest. For a new building, also check the developer and read new build vs resale in Montenegro.
- Ask your lawyer to confirm the current legalisation deadline and the status of any amendments before you rely on "it will be legalised".
In the contract
- The sale contract is notarised and the notary looks at the cadastre. If a notary hesitates, treat it as a signal, not as an obstacle to get around, for example with a preliminary contract that promises to legalise "later".
- Keep the deposit refundable until a fresh extract shows no restriction, and put the conditions for its return in writing. Our resale checklist covers the reservation agreement and deposit terms.
- If legalisation is still ahead, write down who pays, who is responsible if it fails, and by when, and price the property as if it might not be completed.
Questions to put to the seller in writing
- Is the building in the cadastre, and does the registered area match the building?
- Is there a construction permit and a use permit for the whole building?
- Has the building been legalised, and where is the decision? If only an application has been filed, when and with what result?
- Does the extract carry any transfer-restriction or other annotation?
- Has anything been added or converted since the permit was issued?
- Who is the owner on the extract, and who else has a share?
Red flags
- The agent says the application "has been filed" as if that were the same as legalisation.
- The price is clearly below similar properties in the same place.
- The building or the extension is not visible in the cadastre, or the registered area differs from what you see.
- A notary or lawyer hesitates, and you are told to sign a preliminary contract first.
- You are pressed to pay a deposit before you have a fresh extract.
- The seller will not give the permits, only reassurance.
Short checklist
- Fresh cadastre extract, compared with the building.
- Construction permit and use permit.
- Legalisation decision and cadastre entry, if relevant.
- No transfer-restriction annotation on the fresh extract.
- Seller's title, co-owners and land category.
- Mortgage position confirmed with the bank.
- Contract: refundable deposit, conditions in writing, liability for legalisation.
Other countries
The same checks differ from country to country: see the guides for Portugal, Spain, Italy, Greece, Cyprus and Turkey.
How we help
We can introduce independent Montenegrin lawyers and engineers and go through the documents with you. We do not replace them, and we do not promise that a property will pass the checks. For the market overview see the Montenegro country page. General information only, not legal advice.