What an unauthorised structure means in Greece, which documents prove what, how to check before you pay and how to protect yourself in the contract.
Buyers who search for this usually want one answer: if the house or flat I am about to buy has an extra room, a closed balcony or a floor that is not on the plans, whose problem is it after I sign? In Greece the safe assumption is that it becomes yours unless the paperwork and the contract say otherwise. That is why the checks below belong before the reservation deposit and the preliminary agreement, not at the notary's office. This is general information, not legal advice. Most of the sources we found are law-firm, broker and press pages, and Greek rules change often, so confirm every point with a Greek lawyer and an engineer.
What "illegal" usually means in Greece
Greek law calls a building, or part of one, built without a permit or beyond what the permit allows an unauthorised structure (in Greek, αυθαίρετο). The word covers very different situations:
- A whole building or a floor built with no permit at all.
- An extension, an enclosed balcony, an attic or basement converted to living space beyond the approved plans.
- A change of use, for example a storage room used as a flat.
- A building whose permit exists but has been annulled or is under court review.
Whether a problem can be fixed depends on the date, the zone and the category of the violation. The main regularisation regime is Law 4495/2017, which has been amended and extended many times. A November 2025 press report gave 31 December 2027 as the deadline for legalising unapproved buildings, while other sources differ and the framework was reported to have changed again in 2026. An October 2026 press report says a ministry planning bill does not reopen the general route for the most serious category (Category 5, closed since autumn 2020) but widens the exemptions that apply to it; we could not confirm whether that bill has passed. Treat any deadline you read, including these, as something your lawyer must confirm on the day you buy.
The documents to ask for, and what each one proves
- Ownership: the seller's notarial deed and an extract from the land registry or cadastre showing who is registered and whether the property is registered at all or still in the process. It proves who owns. It does not prove that the building is lawful. For inherited houses, see our checklist for buying an inherited village house.
- Building permit and approved plans: they prove what was allowed to be built. The question to answer is whether what stands today matches them.
- The engineer's statement and the electronic building identity (ταυτότητα κτιρίου, often called the e-ID). Broker and law-firm sources say a certified engineer must compile it for a sale and that a notary may refuse to certify the contract without it. It records the permit status of the building and any deviations. We did not find the official texts, so ask your lawyer which certificates apply to your type of property and its date.
- Proof of legalisation, if the seller says an extension was legalised: ask for the declaration, proof that the fine was paid and the confirmation that the procedure is complete, not only the application.
- Utility and tax records: useful as consistency checks only. A tax return or an electricity bill does not make a room legal.
How to check in practice
1. Before you pay anything, ask for the permit, the plans and the engineer's statement. A seller who cannot produce them is already telling you something. 2. Hire your own engineer, not the seller's, to measure the property and compare it with the plans. Fees vary and the sources we found disagree, so ask for a fixed quote in writing. 3. Have your own lawyer, not one recommended by the agent or the developer, read the documents. Here is why that matters. 4. Check the zone. Islands, coastal strips, forests and archaeological areas carry extra limits, and press reports say new permits were frozen in parts of Mykonos, Santorini and Hymettus in late 2025. A plot you can buy is not always a plot you can extend. 5. Check that the permit itself is safe. A case before the Council of State was reported to be deciding whether the law can regularise buildings whose permits were annulled or are under judicial review. A building in that position carries a legal risk that a clean-looking file does not show. 6. Ask which office holds the file. Press reported in late 2025 that the handling of building permits is moving to the cadastre, and a new planning framework is expected from 2027, so records may sit in more than one place.
What the consequences can be
If a violation is found after you buy, the cost and the risk fall on the owner. Depending on the date and category, a structure can be legalised against a fine, can be left alone for a time or can be subject to a demolition order. Even where nothing is enforced, an unresolved violation can stop a sale, because the engineer's statement and the notary need the papers to match, and it can stop a mortgage, because banks and valuers read the same documents. Sources say the seller has to disclose known violations and normally bears the cost of legalising them. That is a reason to settle the question in the contract, not a reason to assume it will be settled for you.
Contract and payment tactics
- Make a clean engineer's statement and, if relevant, completed legalisation a condition of the deal, not a promise to be fulfilled later.
- If legalisation is still to be done, agree who pays, by when and what happens if it fails: a price reduction, a refund of the deposit or the right to withdraw.
- Keep part of the price with your lawyer or in escrow until the paperwork is complete. Do not pay the full price against a promise.
- Ask for the seller's written statement that the property matches the permit, and that nothing has been built since.
- Do not accept a non-refundable deposit before the checks are done.
For a new build, the risk moves from extensions to the developer's permit and completion papers; see how to verify a developer abroad and new build or resale in Greece.
Red flags
- The seller or agent says that everyone builds like this and it never causes trouble.
- The seller cannot or will not give the permit, the plans or the engineer's statement.
- What you see does not match the plans: extra rooms, a closed balcony, a different roofline.
- The price is far below comparable properties and the explanation is vague.
- Legalisation is promised after the sale, or the seller wants you to handle it.
- The property is in a forest, coastal, archaeological or protected zone and nobody has checked it.
- Pressure to sign quickly, or to pay in cash.
A short checklist
- Notarial deed, cadastre extract and chain of title checked by your lawyer.
- Permit and approved plans obtained and compared with the property by your engineer.
- Engineer's statement and e-ID requirement confirmed for your property.
- Any legalisation proved as complete, not only applied for.
- Zone and special restrictions checked.
- Permit not annulled or under court review.
- Conditions, retention of part of the price and withdrawal rights written into the contract.
The same logic, with local differences, applies in the other markets of this series: Portugal, Spain, Italy, Turkey, Montenegro and Cyprus. For the general picture, read illegal construction and missing permits abroad and buying land abroad: plots, zoning and building permits.
How we help
We can help you prepare the list of documents to request, explain what each one is meant to prove and put you in touch with independent local lawyers and engineers, so that the checking is done by people who do not depend on the sale. The legal opinion itself must come from a Greek lawyer. See also the Greece country page.